High-Strength Structural Steel Truss with Factory Pre-Assembly for Efficient Warehouse Roofing
Contact Supplier
Product Highlights
- Factory Pre-Assembly: Up to 90% of fabrication completed in workshop before shipment, minimizing on-site work.
- Accelerated Timelines: Reduces total project duration by up to 50% compared to conventional on-site fabrication.
- 1:1 Trial Assembly: Full-scale trial assembly in factory ensures perfect fit and eliminates field rework.
- Column-Free Spans: Triangular lattice design enables wide, unobstructed interior spaces for warehouses.
- Certified Material Traceability: Includes full Mill Test Certificates (MTCs) with heat number traceability for all steel.
- Weather-Independent Production: Workshop fabrication proceeds regardless of rain, wind, or extreme temperatures.
- Multiple Configurations: Available in Warren, Pratt, Howe, or custom lattice designs tailored to project needs.
- Comprehensive Warranty: 12-month warranty covering material and workmanship with 24-hour technical support.
Product Attributes
- Customization
- Available
- After-sales Service
- 24/7 Online Technical Support
- Connection Form
- Welded Connection
- Model NO.
- Truss
- Construction Member
- Steeltruss
- Grade
- Low-Alloy High-Tensile Structural Steel
- Molding Method
- Hot-Rolled Steel
- Residential Wall Structure
- Wall Stud
- Standard
- ASTM
- Steel Type
- High-Strength Steel
- Structure
- Truss Structure
- Fabrication Method
- Factory Pre-Assembled
- Structural Form
- Triangular Lattice / Warren / Pratt / Howe
- Surface Treatment
- Shop Primer / Hot-DIP Galvanized
- Primary Application
- Warehouse Roofing, Industrial Storage Facilities
- Span Capability
- Custom-Engineered (Column-Free Interiors)
- Design Code
- Aisc 360 / Eurocode 3 / GB
- Field Assembly
- Bolted Connections-Minimal on-Site Welding
- Transport Package
- Seaworthy Packing
- Specification
- Heavy Section Steel
- Trademark
- Quality Carbon Structural Steel and Alloy Structur
- Origin
- China
- HS Code
- 730890000
- Package Size
- 150.00cm * 120.00cm * 80.00cm
- Package Gross Weight
- 300.000kg
- Lead Time
-
180 days (1 - 100 Tons)
To be negotiated ( > 100 Tons)
Shipping
- Shipping Cost:
- Contact the supplier about freight and estimated delivery time.
Online Trading Protection
- Payment Guarantee
-
Platform-protected payments with refund support for eligible order issues.
- Platform Logistics
- Clearer shipment tracking with platform-supported logistics.
- Inspection Service
- Optional pre-shipment inspection for quality and quantity checks.
- After-Sales & Dispute Handling
- Platform-assisted dispute resolution, including refunds or returns when applicable.
Only orders placed and paid through Made-in-China.com Secured Trading are eligible for payment protection and the corresponding platform services.
Product Images of High-Strength Structural Steel Truss with Factory Pre-Assembly for Efficient Warehouse Roofing
Find Similar Products
Product Description
Conventional On-Site Fabrication | Our Factory Pre-Assembly |
Cutting and welding performed in the field | All cutting, drilling, and welding completed in the workshop |
Quality depends on site conditions and worker skill | Precision CNC equipment and controlled conditions ensure consistent quality |
Weather delays common | Fabrication proceeds regardless of weather |
Extensive on-site labour required | 85–90% of the work is done before shipment |
Trial assembly on-site (if at all) | Full 1:1 trial assembly in the factory before disassembly and packing |
Rework and adjustments on-site common | Components fit perfectly—no field rework |

With the majority of fabrication completed off-site while your foundations and site work proceed in parallel, you can reduce total project duration by up to 50%. On-site erection becomes a simple matter of bolting together pre-fitted components—a small crew can complete the roof structure in days rather than weeks.
Shop fabrication under controlled conditions ensures dimensional accuracy and consistent quality that field fabrication cannot achieve. Every weld is performed by certified welders using approved procedures, and each truss undergoes full inspection before it leaves our facility.
By moving the bulk of the work from the field to the factory, we significantly reduce on-site labour requirements. Your site team needs fewer workers for less time—lowering your labour costs and reducing on-site safety risks.
Because every truss is trial-assembled at 1:1 scale in our workshop before shipment, we verify that all components fit perfectly. When your truss arrives on-site, there are no surprises, no adjustments, and no rework—just efficient assembly.
Fabrication in our workshop proceeds regardless of weather conditions. Rain, wind, or extreme temperatures do not delay your project—only the final bolting assembly happens on-site.
The triangular lattice configuration efficiently transfers loads through axial forces, enabling spans customised to your project without intermediate columns. This creates the open, unobstructed floor space that warehouses need for high-bay racking, material handling equipment, and efficient goods flow.
High-strength structural steel delivers exceptional load capacity with minimal self-weight. This means lighter foundations, reduced steel consumption, and lower overall project costs compared to conventional beam-and-column systems.
We offer multiple truss configurations—Warren (zigzag diagonals for uniform loads), Pratt (diagonals slope toward centre for heavy loads), Howe (diagonals slope away for shorter spans), or custom lattice for tailored geometry. Our in-house engineering team uses Tekla Structures and STAAD Pro to model every truss, considering your specific span, roof slope, and load requirements.

• S355JR (EN 10025-2) – European standard grade for projects requiring EN compliance.
• ASTM A572 Gr.50 – American standard grade for projects requiring AISC compliance.
Every steel delivery includes complete Mill Test Certificates (MTCs) confirming chemical composition, mechanical properties, and heat numbers—ensuring full material traceability from mill to finished truss.
All members are CNC cut to exact length and CNC drilled for bolt holes with positional accuracy. Welding is performed by certified welders using approved WPS (SMAW/GMAW/SAW). Components are assembled on dedicated jigs to maintain consistent geometry across all trusses.
Every truss is fully assembled in our workshop at full scale before any component is packed for shipment. This allows us to:
• Confirm that all members fit together perfectly
• Identify and correct any issues before shipment
• Document the assembly sequence for your site team
Step 3: Inspection & Testing
• Visual inspection of all welds
• NDT (Ultrasonic Testing / Magnetic Particle) on critical joints as required
• Coating thickness verification using magnetic gauges
Step 4: Disassembly, Marking & Packing
The truss is carefully disassembled, and every member is clearly stencilled with a unique erection tag matching the assembly drawings. Components are packed in heavy-duty crates with edge protection and moisture barriers.
Your site team receives a complete package: pre-cut, pre-drilled, pre-welded components, detailed erection drawings, and a step-by-step assembly sequence. Erection is simply a matter of bolting together marked pieces following the provided drawings.
Item | Detailed Description |
Steel Material | Grades: Q355B (GB/T 1591) – yield ≥355 MPa (≤16mm) / ≥345 MPa (16-40mm); tensile 470-630 MPa; CEV ≤0.45%. Alternatives: S355JR (EN 10025-2), ASTM A572 Gr.50. Impact toughness: ≥34J at -20°C. Full MTCs with heat number traceability provided. |
Pre-Assembly & Fabrication | Pre-assembly rate: Up to 85–90% shop-completed. Trial assembly: 1:1 full-scale assembly in workshop before disassembly. Fabrication: CNC cutting/drilling, jig-set assembly, welding by EN ISO 9606-1 certified welders. Tolerances: Length ±2mm; Straightness ≤L/1000; Hole centre ±1.5mm. |
Truss Configuration | Types: Warren, Pratt, Howe, or custom lattice. Chord members: H-beams (up to 900mm depth), fabricated box sections. Web members: Angles, tubes, or channels. Thickness range: 6-40mm with stiffeners at supports and load points. All sections verified for local and global buckling per design code. |
Design & Compliance | Design Codes: AISC 360, Eurocode 3 (EN 1993-1-1), or GB. Seismic: AISC 341 or Eurocode 8 available. Welding Standard: AWS D1.1 or EN 1090-2. Execution Class: EXC2 (standard) / EXC3 (request). Quality: ISO 9001. |
Connection System | Shop connections: Full-penetration butt welds for chord splices; fillet welds for web-to-chord joints. Field connections: High-strength friction-grip bolts (Grade 8.8 or 10.9) – no field welding required. Gusset plates: 10-20mm thickness, bolt pattern per code for shear and bearing capacity. All bolt holes pre-drilled. |
Corrosion Protection | Standard: Abrasive blast to Sa2.5 (ISO 8501-1) → Zinc-rich primer 75μm DFT → Epoxy/polyurethane topcoat, total DFT 120-160μm. Upgrade: Hot-dip galvanizing per EN ISO 1461, mean ≥85μm. Suitability: C2 to C5 corrosivity categories per ISO 12944. |
Our commitment extends well beyond delivery. We provide detailed erection drawings with step-by-step assembly sequences, and on-site supervision is available upon request. A 12-month warranty covers material and workmanship. Our engineering team offers technical assistance within 24 hours of any post-shipment query. Full documentation—including Mill Test Certificates, NDT reports, and as-built drawings—is provided for your project file.



About the Supplier
Company Profile
As the co-founder of FAMOUS Engineering Company, Mr. Tomy GAO has been in the construction field for many years, and established series of companies with the target to create ecological chain in the building construction industry.
Nowadays, under FASECBuildings Group, there are several typical companies namely:
1. Hangzhou FAMOUS Steel Engineering Company
2. FASEC (Hangzhou) Window Wall Company
3. Hangzhou FASEC Building Material Company
Hangzhou USEU Metal Manufacturing Company and some more not listed here.
The key business scope of FASECbuildings Group include but not limited at:
1. Structural Steelworks & Steel Framing (Heavy/Light) construction
2. Glass Windows Doors, Curtain Wall Facade, Metal Claddings, Screens Grills, BIPV etc
3. Building Roof Wall Flooring integrated material and other interiors new material R & D.
FASECbuildings Group always aim to offer cost saving prefab materials for USA-Europe & UK-Australia etc foreign standard market customers, with freely technical supports like engineering design when needed/detailing drawings/site construction guidance etc. We have multiple certification/experiences as well as the overall 2D/3D modelling capability for the building framing and the surroundings.
Brief Introduction of Subsidiaries:
1. Hangzhou FAMOUS Steel Engineering Co., Ltd. Focus on the Design & Construction of various Steel Buildings and Structural Steelworks fabrication. The company have received a lot of foreign projects ranging from warehouse buildings, multi-storey apartments, high rise office & hotel buildings, space framing theaters, triangle truss buildings, to steel bridges, handling machinery framing, power plant towers, mining production line steelworks, cement production line steelworks, petro-chemical rackings etc. Basically the company have the full capability to operate various large-scaled projects complex except the simple building project.
2. FASEC (Hangzhou) Window Wall Company specializes in the offer of various aluminum & glass-related products design/manufacture/supply & installation. We have successfully supplied quite a lot of insulated & laminated glass panes, windows, glass doors, curtain walls, partition walls, railings, louvers, grills, metal claddings etc not only in China but also around the world. Australian standard, British Standard, Europe standard, and American standard etc aluminum & glass facade products are in our main research & development range.
FASECBuildings Group have passed by series of certifications like the quality management system (ISO 9001: 2008), the Europe product quality control system EN1090, the structural fabrication system certificates of Europe ISO3834 and America AWS D1.1, the Australia AS2047 Glazed Windows Doors Qualifications etc.
Currently, FASECbuildings Group have spread its network across Xi'an, Shanghai, Nanjing, Guangzhou, Wuhan, Xiangfan, Liuzhou, Wuhu, Suzhou, Zhengzhou, and Yunnan, etc., as well as exporting business with America, Canada, Australia, New Zealand, United Kingdom, Germany, France, Bolivia, Chile, Argentina, Uruguary, Peru, Thailand, Philippine, Nigeria, Vietnam, South Africa, Ghana, Kenya, Zambia, UAE, Sudan, Irap, Angola, Poland, Mongolia, and so on.
Through so many domestic & overseas project cases, FASECbuildings Group has successfully won reputations and experiences not only in China, but also in various foreign standards markets with examples of Europe Standards, America Standards, Australia Standards, British Standards, etc building related materials and building construction.
We keep improvement and innovation, with the slogan of "USA-Europe Standard Engineering and Quality Control Build Our Brand Reliability! One Trial Order Bring Constant Cooperation! "
Warmly welcome Customers to visit and communicate with us for free budget and detailed products catalog obtaining. Thank you a lot!
About Our Factory & Business Background
- Address
- Yuancun Village, Xindeng Town, Fuyang District, Hangzhou, Zhejiang, China
Our Production Capability & Technical Expertise
FAQ
- What does "factory pre-assembly" mean for my warehouse roofing project?
- Factory pre-assembly means the entire truss is fully fabricated, trial-assembled, and inspected in our workshop before any component leaves our facility. All members are cut, drilled, welded, and fitted together at 1:1 scale to verify dimensional accuracy. After inspection, the truss is disassembled, marked, and packed for shipment--so your site crew simply reassembles it using bolted connections with no on-site cutting, welding, or rework.
- How much time can I save with factory pre-assembled trusses?
- Factory pre-assembly can reduce on-site installation time by up to 50% compared to conventional field-fabricated methods. With 85% or more of the work completed in the factory, your site team can erect the roof structure in a fraction of the time--often completing installation in days rather than weeks. This translates to faster project completion and significantly lower labour costs.
- How does factory pre-assembly ensure better quality than on-site fabrication?
- Shop fabrication occurs in a controlled environment with precision CNC equipment, dedicated jigs, and consistent conditions--eliminating the variables that affect on-site work (weather, limited access, varying worker skill levels). Every weld is performed by certified welders using approved procedures, and each truss undergoes full dimensional inspection and NDT testing before shipping. This ensures consistent quality that field fabrication simply cannot match.
Send your message to this supplier
People who viewed this also viewed
-
US$1,000.00 / Ton
Find Similar Products By Category
- Supplier Homepage
- Products
- FAMOUS Steel
- Steel Truss & Space Frame
- High-Strength Structural Steel Truss with Factory Pre-Assembly for Efficient Warehouse Roofing
Related Categories
Hot Searches
- Steel Wire Factories
- Steel Structure Factories
- Steel Fitting Factories
- Steel Beam Factories
- Truss Building
- Steel Truss Buildings
- Steel Truss Light
- Steel Structure Truss
- Truss Bolt
- High-Strength Steel Truss Bulkbuy