Office Building Glass Facade Curtain Wall System
Contact Supplier
Product Highlights
- 30-Year Warranty: Comprehensive coverage for 30 years on the curtain wall system.
- Double/Triple Silver Low-E Glass: Advanced thermal insulation with up to 13 layers for superior energy efficiency.
- Customizable Color and Surface: Available in Dark Gray with Powder Coat or PVDF surface finishing options.
- High Security Rating A: Meets top-tier safety standards for anti-theft and durability.
- Multi-Function Protection: Provides heat insulation, soundproofing, airproof, insect-proof, and dust-proof capabilities.
- Stick-Built Construction: Flexible, cost-effective on-site assembly ideal for small to mid-sized projects.
- OEM and ODM Services: Full customization support with available R&D engineers and production machines.
- Wide Glass Color Options: Includes Euro bronze, Gold, Ford blue, Dark blue, Dark green, and more.
Product Attributes
- Customization
- Available
- After-sales Service
- by After-Service Manager
- Warranty
- 30 Years
- Model NO.
- FC050
- Material
- Aluminum Alloy
- Open Style
- Opening
- Frame Material
- Aluminum Alloy
- Screen Netting Material
- Fiberglass
- Style
- Modern
- Opening Pattern
- Horizontal
- Function
- Heat Insulation, Soundproof, Anti-Theft, Airproof, Insect-proof, Dust-proof, Decoration
- Surface Finishing
- Finished
- Security Rating
- A
- Color
- Dark Gray
- Surface
- Powder Coat or PVDF
- Insulation
- Double or Triple Insulated
- Heat Value
- Double or Triple Silver Treatment
- Transport Package
- Seaworthy Packings
- Specification
- Fasecbuildings01
- Trademark
- FASECbuildings
- Origin
- China
- Production Capacity
- 900000 Pieces Per Year
Product Images of Office Building Glass Facade Curtain Wall System
Find Similar Products
Product Description
Double Insulated Aluminum Glass Curtain Walls Facade Glazed Windows Doors
Glass Façade Stick Curtain Walling (SWC) system may be defined as non-load bearing walls, usually suspended in front of structural steel or concrete framing. The term "stick" refers to the factory-cut mullions and transoms which are transported to site as loose bars and sticks. However it is possible to assemble them into a ladder frame often referred to as "ladders" for quicker site assembly.
A stick built curtain wall refers to the method of construction by which glass façade curtain wall is assembled on site, piece by piece. The manufacturer delivers each individual component; glass, mullion, spandrel; and glaziers assemble the curtain wall directly on the structure.
The stick built system requires installation by highly skilled laborers on site, increasing the installation cost and causing some quality control issues. However, the on site installation allows for easier detailing of connections and larger tolerances in the building structure.
The advantage of a stick built system comes from its cost savings over a unitized system. On small project, the scale is too small to make it economical to prefabricate panels, so the added on-site time and cost is worth the higher unit cost associated with a small scale unitized system. For this reason, stick built systems are typically used on small to mid-sized projects.
| HOW TO CHOOSE FROM STICK and UNITIZED CURTAINWALL SYSTEMS | ||
| Selection Criteria | Stick Curtainwall | Unitized Curtainwall |
| Project Size | Small | Large |
| Wall Configuration |
Complex (Many changes in plane, e.g. soffits, corners, etc.) |
Repetitive (Large expanses of flat wall) |
| Joint Pattern | Random | Uniform horizontal sill line |
| Glazing | Field | Factory |
| Inter-story Movements | Very limited | Inter-locking frames accommodate movements |
| Quality Control |
Subject to site variables (Both environment and equipment) |
Controlled factory conditions |
| Modification | Can be cut-to-fit in the field | Pre-engineered |
| Sealing | Subject to site variables | Minimal field sealing |
| Field Labor Cost |
High (Many parts to track and assemble) |
Low |
| Field Labor Duration | Slow |
Fast (Often setting 75 sqft or more per unit) |
| Access and Safety | Exterior access required |
Set from the interior (Exterior optional) |
our stick system façades are the flexible, tried-and-tested versatile solutions among the range of façade systems. The wide range of profiles and the extensive equipment options offer you optimum creative freedom. The state-of-the-art technology ensures the highest level of process security, from the planning stage through to completion. With narrow face widths of 50 and 60 mm, the system construction lends façades a particularly filigree appearance. Additional functions for security and maximum thermal insulation may be included simply and inexpensively, without compromising on aesthetics.
Specification:
| Thickness | 12-100mm |
| Layers | 2 and more |
| Composition | 5+6A+5, 6+9A+6, 6+12A+6, etc. |
| Glass Color | Euro bronze, Gold, Ford blue, Dark blue, Dark green, F-green, Dark gray, Grey, Pink, etc. |
| Light Transmittance | 33%~80% |
| Energy Transmittance | 23%~54% |
| Application | widely used in curtain wall, door, window, icebox |
Suitable for Parched Torridity Zone On-line and Off-line Double or Triple Sliver Low-E Reflective tempered Glass Insulated Curtain Wall, Low-E glass(Low Emissivity Glass), is a film product composed of multiple layers of metal or other compounds coated on the surface of the glass. The main functional layer of the Low-E film is the silver layer. Silver is one of the substances with low emissivity in nature. The nano-level silver layer is plated on the glass surface to reduce the emissivity of the glass from 0.84 to 0.02~0.12. Thereby filtering the sunlight into a cold light source. The coating layer has the characteristics of high transmission of visible light and high reflection of mid- and far-infrared rays, thereby filtering sunlight into a cold light source, which not only meets the requirements of natural lighting, but also ensures a comfortable room temperature.
After installing the triple silver Low-E hollow, the comfort of the human body can be improved. Since the human body's burning sensation is caused by solar radiation near infrared, the higher the gIR, the higher the infrared transmission, the lower the gIR, and the lower the infrared transmission. The infrared transmission gIR of Sanyin can be below 0.06, which means it is reflected off. Most of the heat, the burning sensation has been significantly improved, it is very suitable for use in hot areas, and the comfort level is greatly improved.
General Low-E glass only contains a pure silver layer (functional layer), the so-called single-silver Low-E glass.
The total number of layers of double silver glass reaches more than 9 layers, including two pure silver layers;
Three silver Low-E glass contains a total of more than 13 layers, including three pure silver layers.
Compared with single-silver Low-E glass, although double and triple-silver Low-E glass has higher processing technology requirements, its energy saving performance is much better than single-silver Low-E glass.
Function
Optical parameters: Under the premise of the same light transmittance, double silver and triple silver Low-E have lower shading coefficient Sc and heat transfer coefficient U,
Double-silver and triple-silver Low-E glass can block more solar radiation heat than single-silver Low-E glass, and filter sunlight into a cold light source to a greater extent.
Indoor comfort: Low-E glass can greatly reduce the heat exchange between indoor and outdoor environments through the glass, so when the air conditioner is cooling or heating, after the indoor temperature reaches the set temperature, the air conditioner can stay on standby for a longer time Status, thereby saving power consumption.
Not only that, the shading characteristics of Low-E glass greatly reduce the time of using curtains to shade, thereby improving indoor light comfort and creating a more transparent and beautiful indoor environment.
To make a simple analogy, in summer, a building with ordinary glass originally required air-conditioning and cooling for an effective operating time of 100 days. After using single-silver Low-E glass, the effective operating time for cooling required was shortened to 35 days, and if double-silver was used Or three silver Low-E glass, it only takes about 30 days or less, further saving electricity bills.
In the long run, although the use of double and triple silver Low-E glass increases a small amount of project construction costs, it greatly reduces the energy consumption during the use of the building, and the later energy saving can recover the investment in a short time. The cost of the increase.
Packing Method:
About the Supplier
This supplier has been audited by SGS. Verify the report on the official SGS website with ID "QIP-ASI233805". Items marked "" are certified.
Company Profile
FASEC (Hangzhou) Window Wall Group is a company specializing in the offer of various aluminum & glass-related products design/manufacture/supply& technical support.
We successfully supplied quite a lot of various insulated& laminated glasses, windows, glass doors, glass curtain walls, stainless steel balustrades, louvers, metal claddings, aluminum perforated panels, screens, etc not only in China but also around the world. So either Australian standard, British Standard, European standard or American standard, etc aluminum & glass facade products are in our main research & development range. We emphasize and encourage constant creation and win worldwide customers' high recognition and praise. Our key advantages are very competitive price and comprehensive technical capability which enable us to be pioneering in the field.
Besides, our relative companies (same shareholder) Hangzhou FAMOUS Steel Engineering Co., Ltd and USEU Metal Products Co., Ltd focus on the sustainable design and supply of various modular steel buildings and its roof wall floor materials, including but not limited in steel framed buildings, structural steelworks construction, global composite floor decks, light steel villa & prefab modular houses, heavy/light steel framing fabrication, lightweight panels, galvanized steel purlins girts, galvanized metal cladding etc building materials. The companies have multiple production lines and very mutual supply chains both in domestic and overseas markets. The companies have passed by various certification systems including the quality management system (ISO 9001: 2008), the structural quality control system EN1090-2, the welding system certificates of Europe ISO3834-2 and America AWS D1.1, etc.
The target of FASEC Window Wall Group and its related companies are not only in the China standard products supply but also the worldwide high-level standards building products research/development/design/manufacture/supply/technical offers. Hopefully, under our powerful technical teams, professional service, manufacturing bases, and global concept supply chains, we can build more long-term relationships with honorable global purchasers.
Currently FASEC Window Wall Group has set up a marketing and service network across Xi'an, Shanghai, Nanjing, Guangzhou, Wuhan, Xiangfan, Liuzhou, Wuhu, Suzhou, Zhengzhou, and Yunnan, etc., as well as exporting business with Australia, New Zealand, Germany, France, UK, Bolivia, Chile, Peru, Argentina, Thailand, Philippine, Singapore, Hongkong, Nigeria, Vietnam, South Africa, Ghana, Kenya, Zambia, UAE, Sudan, Saudi Arabia, Angola, America, Canada etc.
Through so many overseas project cases, FASEC Group has successfully won the reputations and experiences in various foreign standards fields with examples of Europe Standards, American Standards, Australian Standards, British Standards, etc related materials and building construction. We keep improvement and innovation, with the slogan of "USA-Europe Standard Engineering and Quality Control Build Our Brand Reliability! One Trial Order Bring Constant Cooperation!
About Our Factory & Business Background
-
Business Type
- Manufacturer/Factory & Trading Company
- Address
- Yuancun Village, Xindeng Town, Fuyang District, Hangzhou, Zhejiang, China
-
Plant Area
- 1960 square meters
-
Number of Employees
- 10
-
Registered Capital
- 10,000,000 RMB
-
Terms of Payment
- LC, T/T, D/P, PayPal, Western Union, Small-amount payment
-
International Commercial Terms(Incoterms)
- FOB, CIF, CFR
-
Average Lead Time
- Peak Season Lead Time, one month, Off Season Lead Time, one month
-
Nearest Port
- Shanghai Port, Ningbo Port
Our Production Capability & Technical Expertise
-
Main Products
- Glass Doors Windows & Curtain Walls
-
Production Machines
- Sawer, Milling machine, CNC milling machine, Angle assembly, Assembly line
-
ODM Service Available
- Yes
-
OEM Service Available
- Yes
-
R&D Engineers
- 1 people
-
Own Brand
- Yes
Our Industry Experience & Global Business Record
-
Year of Establishment
- 2022-03-01
-
Main Markets
- North America, Southeast Asia/ Mideast, Australia, Domestic
-
Number of Foreign Trading Staff
- 3
-
Overseas Agent/Branch
- No
Our Certifications, Standards & Industry Recognition
-
Management System Certification
- Others
FAQ
- What is the warranty period for this system?
- We provide a 30-year warranty for the curtain wall system.
- Is the product customizable in terms of color and surface?
- Yes, the color can be customized to Dark Gray, and the surface can be finished with Powder Coat or PVDF.
- What are the energy efficiency features of the glass?
- It features double or triple silver Low-E reflective tempered glass with up to 13 layers to reduce heat transfer and save energy.
- What is the security rating of this curtain wall?
- The system has a Security Rating of A, ensuring high safety and protection against break-ins.
- Can this system be customized for specific architectural needs?
- Yes, it offers a wide range of profiles and glass colors for tailored design, supported by OEM and ODM services.
- What is the lead time for production?
- The average lead time is one month for both peak and off-peak seasons.
- What payment terms are accepted?
- We accept LC, T/T, D/P, PayPal, Western Union, and small-amount payments.
- Is this system suitable for hot climates?
- Yes, the triple silver Low-E glass is specifically designed for parched and torrid zones to improve indoor comfort.
Send your message to this supplier
People who viewed this also viewed
-
US$110.00-220.00 / Square Meter
-
US$90.00-120.00 / Square Meter
-
US$90.00-150.00 / Square Meter
-
US$70.00-150.00 / Square Meter
-
US$100.00-290.00 / Square Meter
-
US$100.00-290.00 / Square Meter
-
US$150.00-260.00 / Square Meter
-
US$150.00-260.00 / Square Meter
Find Similar Products By Category
- Supplier Homepage
- Products
- Glass Curtain Wall
- Others Glass Curtain Wall
- Office Building Glass Facade Curtain Wall System
Related Categories
Hot Searches
- Glass Wall Factories
- China Curtain Factories
- Curtain Wall Factories
- Window Curtain Factories
- U Glass Curtain Wall
- Window Curtain Wall
- Curtain Wall System
- Aluminium Glass Curtain Wall
- Frame Glass Curtain Wall
- Curtain Glazing System Bulkbuy